around.pk
Tuesday, 24 November 2026
☀ Karachi 29°⛅ Lahore 24°⛅ Islamabad 21°
Pakistan

Power Distribution Companies Ranked Pakistan's Most Corruption-Prone Public Institutions

A government risk assessment covering 25 public sector institutions placed Discos at the top with a score of 61.1, followed by the FBR and CDA, and proposed 396 reforms to curb corruption risks.

around.pk·5h ago

Pakistan's power distribution companies (Discos) have been identified as the public sector institutions most exposed to corruption, according to the government's National Corruption Risk Assessment Report. The assessment, which covered 25 public sector institutions, gave Discos a corruption risk score of 61.1, placing them at the top of the rankings.

The Federal Board of Revenue (FBR) ranked second with 54.4 points, while the Capital Development Authority (CDA) followed in third place with 49.5 points. Passco took fourth position, the National Highway Authority (NHA) came fifth and Pakistan Railways ranked sixth. The Benazir Income Support Programme (BISP), Pakistan Post, Sui Northern Gas Pipelines Limited (SNGPL) and the Evacuee Trust Property Board (ETPB) also appeared among the ten institutions with the highest corruption risks.

According to the report, non-transparent public procurement emerged as the most common weakness across all ten institutions. Other significant concerns included manipulation of official records, weak audit trails and financial irregularities. Revenue leakage risks were flagged in nine institutions, while seven were found vulnerable to embezzlement and misuse of funds.

Despite these findings, none of the 25 assessed institutions fell into the extreme or severe risk categories. The assessment classified one institution as high-risk, three as substantial-risk, 14 as moderate-risk and seven as low-risk, suggesting that while vulnerabilities exist, they remain within manageable bounds.

To address the identified weaknesses, the report proposed 396 reforms aimed at reducing corruption risks across the assessed institutions. The recommendations include merit-based appointments, digitisation of official records, improved data sharing between government bodies and stronger institutional oversight.

The findings are likely to draw attention to the performance of agencies that citizens interact with daily, particularly electricity distribution and tax collection, and to the need for structural improvements in public procurement and record-keeping.

The story so far National Highway Authority

  1. Peshawar Northern Bypass Set for Completion After 18-Year Delay, Minister Says
  2. P3A Approves Plan for Two Sections of Hyderabad-Sukkur M-6 Motorway
  3. Multan-Lodhran Expressway Set for Completion in Six Weeks, Says Minister
  4. Punjab Set to Open Two Rawalpindi Underpasses by December
See the full timeline →
FBRCapital Development AuthorityFederal Board of RevenuePakistan RailwaysNational Highway AuthorityNational Corruption Risk Assessment ReportPower Distribution Companies (Discos)

Continue the story

View all →

Read more